We stripped the room back to the walls, moved the drains to free the window side and laid large-format tiles on a heated floor.

Master bathroom renewal
A dated bathroom turned into a bright space with a freestanding tub.

- Client
- Private client
- Location
- Milan
- Year
- 2025
- Area
- 14 m²
- Duration
- 4 weeks
- Services
- Bathrooms & kitchens, Renovations